Posted in : News and Events
We removed original concrete flooring of east and west Zamboni bays and rebuilt new reinforced concrete slabs. At the east wing of the Sportsplex we also cut concrete flooring to install pre-sloped 4" trench drain and catch basin for ice melt water diversion.
It was a small job but we couldn’t pass on the wonderful opportunity of building something that is very Canadian!